Exclusive content every week
Subscribe and get the best on data, AI and programming directly in your inbox.
Live streams
Vibe coding, tutorials and live Q&A
Courses
Learn data & AI step by step
Articles
In-depth tutorials and analysis
Sparks
Quick tips and tricks
Past issues
Who pockets Spain's €3.9B post-blackout redispatch — and the Besós case
Two new pieces: the €3.9B/year of pay-as-bid going to Spain's CCGT fleet, and the unit-level reshuffle Operación Reforzada produced
Read issueCorrection on Monday's posts: RT3 is technical constraints, not tertiary reserve
Thanks to Sergio Bertolín for the expert feedback. Data and ratios stand, mechanism now precisely identified.
Read issueSpain's RT3 cost ×10 since 2020 — and what changed after the blackout
Two new pieces: 148 months of technical-constraints cost growth, and 365 days pre/post the Iberian blackout
Read issueWhat public data reveals about a 245 MW cogen operator in Spain
≈10,5 M€/year already captured above the market baseline — and 1,2-3,0 M€/year still on the table
Read issueChat with electricity data from Spain, Europe, and the US — no code required
3 new Claude Code skills, 3 library updates, and 3 live streams this week
Read issue