Programming unit · Generación
HENANSA HENANSA
- Technology
- Hidráulica
- Capacity
- 47,5 MW
- Owner
- Unresolved
Physical units (4)
| UF | Description | Technology | MW |
|---|---|---|---|
| BEJO | BEJO | Embalse | 20,8 |
| ROZADIO | ROZADIO | Fluyente | 12,6 |
| HERRER | HERRER | Fluyente | 7,8 |
| CELIS | CELIS | Fluyente | 6,3 |
Linked installations
| Installation | Municipality | Province | MW | Coords |
|---|---|---|---|---|
| HERRERIAS | CANTABRIA Herrerías | Cantabria | 7,9 | 43.3300, -4.5054 |
| PEÑA DE BEJO | CANTABRIA Tudanca | Cantabria | 20,8 | 43.1503, -4.3767 |
| CELIS | CANTABRIA Rionansa | Cantabria | 6,3 | 43.2804, -4.4392 |
| ROZADIO | CANTABRIA Rionansa | Cantabria | 12,6 | 43.2236, -4.3850 |
Recent unavailability
| UF | Start | End | MW available | Cause |
|---|---|---|---|---|
| BEJO | 26 Aug 2019 | 30 Aug 2019 | 0 | UNKNOWN |
| BEJO | 4 Sept 2017 | 5 Sept 2017 | 10.4 | FAULT |
| BEJO | 26 Aug 2017 | 28 Aug 2017 | 0 | SCHEDULED_MAINTENANCE |
| BEJO | 22 Aug 2017 | 25 Aug 2017 | 0 | SCHEDULED_MAINTENANCE |