Programming unit · Generación

EGASNE2 EGASNE2

Watch this unit
Technology
Eólica
Capacity
448,1 MW
Agent (market)
Naturgy · utility GNCO
Owner
Unresolved

Dispatch by program

daily MWh · I90 arrives ~90 days delayed

Physical units (15)

UFDescriptionTechnologyMW
ALMNDROALMNDROEólica43,5
SANBLASANBLAEólica39,6
CARRATCARRATEólica39,6
PMERENMERENGUEEólica39,3
TESOPATESOPAEólica36,3
PEBARAPEBARAEólica36,3
SANAGUSANAGUEólica34,6
VALDEPEVALDEPEEólica30
ASEIXALASEIXALEólica30
PEPREDPEPREDEólica26,8
MIRABEMIRABEEólica26,4
TESORITESORIEólica26
PELBARPELBAREólica22,9
MOURINMOURINEólica9,6
PFORCAPFORCAEólica7,2

Linked installations

InstallationMunicipalityProvinceMWCoords
MIRABELVALLADOLID Valdenebro de los VallesValladolid26,441.8102, -4.9714
PARQUE EOLICO LOS BARRANCOSAndalucía20
CARRATORRESVALLADOLID Valdenebro de los VallesValladolid39,641.8281, -4.9876
P.E. VALDEPEROPALENCIA Fuentes de ValdeperoPalencia3042.0108, -4.5306
PARQUE EOLICO SAN AGUSTIN DE 34,65 MW DE GAS NATURAL WIND 4 SL EN AZAILA / ALMOCHUEL / VINACEITE (TERUEL Y ZARAGOZA)TERUEL VinaceiteTeruel34,741.3232, -0.5855
P.E. PEÑA FORCADAA CORUÑA CamariñasA Coruña33,843.1654, -9.1126
PARQUE EOLICO EL TESORILLOCÁDIZ Jimena de la FronteraCádiz2636.3897, -5.3734
PARQUE EOLICO MERENGUECÁCERES PlasenciaCáceres39,439.9957, -6.1609
PARQUE EOLICO MOURINOSA CORUÑA Cabana de BergantiñosA Coruña9,643.1937, -8.9383
SAN BLASVALLADOLID CastromonteValladolid26,441.8110, -4.9726
PARQUE EOLICO BARÁSOAINNavarra36,3

Recent unavailability

UFStartEndMW availableCause
PMEREN31 Dec 20259 Jan 20260FAULT
ALMNDRO26 Feb 202326 Feb 202343.4FAULT

Subscribe to our newsletter

Get weekly insights on data, automation, and AI.

© 2026 Datons. All rights reserved.