Programming unit · Generación
EFRON FRONTONES
- Technology
- Eólica
- Capacity
- 48,5 MW
- Owner
- Unresolved
Physical units (1)
| UF | Description | Technology | MW |
|---|---|---|---|
| FEFRO | FRONTONES | Eólica | 48,5 |
Linked installations
| Installation | Municipality | Province | MW | Coords |
|---|---|---|---|---|
| FRONTONES | ALBACETE Chinchilla de Monte-Aragón | Albacete | 50 | 38.8022, -1.3780 |
Recent unavailability
| UF | Start | End | MW available | Cause |
|---|---|---|---|---|
| FEFRO | 12 Feb 2026 | 28 Feb 2026 | 45 | FAULT |
| FEFRO | 12 Feb 2026 | 12 Feb 2026 | 43.5 | FAULT |
| FEFRO | 6 Feb 2026 | 6 Feb 2026 | 0 | SCHEDULED_MAINTENANCE |
| FEFRO | 5 Feb 2026 | 6 Feb 2026 | 35 | UNKNOWN |
| FEFRO | 5 Feb 2026 | 5 Feb 2026 | 0 | FAULT |
| FEFRO | 1 Sept 2025 | 5 Sept 2025 | 0 | SCHEDULED_MAINTENANCE |
| FEFRO | 13 Aug 2025 | 13 Aug 2025 | 0 | INSPECTION |
| FEFRO | 5 Aug 2025 | 5 Aug 2025 | 43.5 | SCHEDULED_MAINTENANCE |
| FEFRO | 26 Jun 2025 | 26 Jun 2025 | 0 | OPERATIONAL |
| FEFRO | 23 Dec 2024 | 8 Jan 2025 | 38 | UNKNOWN |
| FEFRO | 13 Dec 2024 | 23 Dec 2024 | 40 | UNKNOWN |
| FEFRO | 10 Dec 2024 | 13 Dec 2024 | 30 | UNKNOWN |
| FEFRO | 26 Sept 2024 | 26 Sept 2024 | 45 | INSPECTION |
| FEFRO | 5 Sept 2024 | 5 Sept 2024 | 0 | UNKNOWN |
| FEFRO | 3 Sept 2024 | 4 Sept 2024 | 0 | SCHEDULED_MAINTENANCE |
| FEFRO | 2 Sept 2024 | 3 Sept 2024 | 0 | SCHEDULED_MAINTENANCE |
| FEFRO | 9 Jul 2024 | 9 Jul 2024 | 45 | SCHEDULED_MAINTENANCE |
| FEFRO | 4 Jun 2024 | 4 Jun 2024 | 25 | UNKNOWN |
| FEFRO | 3 Jun 2024 | 4 Jun 2024 | 25 | UNKNOWN |
| FEFRO | 30 Apr 2024 | 30 Apr 2024 | 45 | SCHEDULED_MAINTENANCE |